{"id":5084,"date":"2019-11-28T13:48:39","date_gmt":"2019-11-28T11:48:39","guid":{"rendered":"https:\/\/blog.febi.com\/?p=5084"},"modified":"2019-12-04T10:59:16","modified_gmt":"2019-12-04T08:59:16","slug":"xxl-project-start-of-construction-for-new-bilstein-group-logistics-center","status":"publish","type":"post","link":"https:\/\/blog.febi.com\/en\/xxl-project-start-of-construction-for-new-bilstein-group-logistics-center\/","title":{"rendered":"XXL Project: Start of Construction for New bilstein group Logistics Center"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">The kick-off for an XXL construction project: Gelsenkirchen&#8217;s mayor, Frank Baranowski, and the managing directors of the bilstein group, Jan Siekermann and Karsten Sch\u00fc\u00dfler-Bilstein, announced yesterday, Wednesday, November 27<sup>th<\/sup>, 2019, the commencement of construction work on the new logistics centre for the Ennepetal-based company and jointly sank a time capsule. In 2017, the bilstein group, one of the world&#8217;s leading manufacturers and suppliers of replacement parts for passenger cars and commercial vehicles, acquired an approximately 200,000 square metre site in the Bulmke-H\u00fcllen district \u2013 on the site of the former Schalker Verein.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A\nbuilding covering an area of approximately 45,000 square meters is now being\nconstructed with a logistics system at its heart which is largely automated. In\nthe future, wear parts will be shipped all over the world from here. Preparations\nare currently underway for the installation of the floor slabs towards the end\nof this year. For this, roughly 1,300 reinforced concrete piles have to be sunk\nup to ten meters deep into the ground.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Ideal Expansion Opportunities<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cWe are pleased that the work has now begun. The area in Gelsenkirchen offers us ideal opportunities for expansion \u2013 now and in the future, because we have the opportunity to significantly expand the currently planned building,\u201d says Group Managing Director, Jan Siekermann. In total, the bilstein group is investing more than 100 million euros in the new location. Completion is scheduled for mid-2022.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Around\n160 jobs subject to social insurance contributions will be created when the\nplant goes into operation. At full capacity, this figure could move in the\ndirection of 400. \u201cThis makes the settlement of the bilstein group one of the\nlargest new developments in Gelsenkirchen in recent years. A new chapter is\nbeing written here in the Schalker Verein industrial park and will bring us\nanother piece of future development,\u201d said the delighted mayor, Frank\nBaranowski, at the start of construction.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/blog.febi.com\/wp-content\/uploads\/2019\/11\/Wifo\u2560\u00ea_Bilstein_Grundst__33-1024x683.jpg\" alt=\"\" class=\"wp-image-5085\" srcset=\"https:\/\/blog.febi.com\/wp-content\/uploads\/2019\/11\/Wifo\u2560\u00ea_Bilstein_Grundst__33-1024x683.jpg 1024w, https:\/\/blog.febi.com\/wp-content\/uploads\/2019\/11\/Wifo\u2560\u00ea_Bilstein_Grundst__33-300x200.jpg 300w, https:\/\/blog.febi.com\/wp-content\/uploads\/2019\/11\/Wifo\u2560\u00ea_Bilstein_Grundst__33-768x512.jpg 768w, https:\/\/blog.febi.com\/wp-content\/uploads\/2019\/11\/Wifo\u2560\u00ea_Bilstein_Grundst__33-696x464.jpg 696w, https:\/\/blog.febi.com\/wp-content\/uploads\/2019\/11\/Wifo\u2560\u00ea_Bilstein_Grundst__33-1068x712.jpg 1068w, https:\/\/blog.febi.com\/wp-content\/uploads\/2019\/11\/Wifo\u2560\u00ea_Bilstein_Grundst__33-630x420.jpg 630w, https:\/\/blog.febi.com\/wp-content\/uploads\/2019\/11\/Wifo\u2560\u00ea_Bilstein_Grundst__33-1920x1280.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption>A view of the construction site: The bilstein group logistics centre will be built here (Photo: City of Gelsenkirchen, Hansj\u00fcrgen Smit).<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Going Green <\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"> The logistics centre will be built according to the KfW55 standard. This means that 45 percent less energy is consumed than in a comparable new building without additional efficiency measures. This is extremely rare in the industrial sector. The bilstein group also focuses on energy efficiency in other areas: a large photovoltaic system is planned, supplemented by around 15,000 square metres of green roofs. In addition, heat is to be supplied by district heating. <\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Strong Partners<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The company <a href=\"https:\/\/bms-industriebau.de\/\">BMS Industriebau<\/a> GmbH from Brilon in the Sauerland region of Germany is responsible for the construction of the logistics centre based on designs by the Ennepetal architecture firm, <a href=\"http:\/\/www.frey-en.de\/\">Frey + Frey Architekten<\/a>. \u201cWe congratulate the bilstein group and the city of Gelsenkirchen on the construction of the new logistics centre. The construction of this property is not an everyday challenge for us either,\u201d stresses Ferdinand Nolte, Managing Partner of BMS.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Upper Palatinate company, <a href=\"https:\/\/www.igz.com\/\">IGZ Automation GmbH<\/a>, was commissioned with the logistics planning. &#8220;During the project planning of the logistics centre, we were able to contribute our entire experience and competence with innovative ideas to the project,&#8221; says Alfred Meyer, Managing Director of IGZ. \u201cWith the use of the SAP standard software EWM \u2013 Extended Warehouse Management \u2013 as warehouse management and material flow software, the bilstein group is optimally prepared for the future requirements of a logistics 4.0.\u201d<\/p>\n<div class=\"shariff shariff-align-left shariff-widget-align-left\"><ul class=\"shariff-buttons theme-default orientation-horizontal buttonsize-medium\"><li class=\"shariff-button facebook shariff-nocustomcolor\" style=\"background-color:#4273c8\"><a href=\"https:\/\/www.facebook.com\/sharer\/sharer.php?u=https%3A%2F%2Fblog.febi.com%2Fen%2Fxxl-project-start-of-construction-for-new-bilstein-group-logistics-center%2F\" title=\"Bei Facebook teilen\" aria-label=\"Bei Facebook teilen\" role=\"button\" rel=\"nofollow\" class=\"shariff-link\" style=\"; background-color:#3b5998; color:#fff\" target=\"_blank\"><span class=\"shariff-icon\" style=\"\"><svg width=\"32px\" height=\"20px\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 18 32\"><path fill=\"#3b5998\" d=\"M17.1 0.2v4.7h-2.8q-1.5 0-2.1 0.6t-0.5 1.9v3.4h5.2l-0.7 5.3h-4.5v13.6h-5.5v-13.6h-4.5v-5.3h4.5v-3.9q0-3.3 1.9-5.2t5-1.8q2.6 0 4.1 0.2z\"\/><\/svg><\/span><span class=\"shariff-text\">teilen<\/span>&nbsp;<\/a><\/li><li class=\"shariff-button twitter shariff-nocustomcolor\" style=\"background-color:#595959\"><a href=\"https:\/\/twitter.com\/share?url=https%3A%2F%2Fblog.febi.com%2Fen%2Fxxl-project-start-of-construction-for-new-bilstein-group-logistics-center%2F&text=XXL%20Project%3A%20Start%20of%20Construction%20for%20New%20bilstein%20group%20Logistics%20Center\" title=\"Bei X teilen\" aria-label=\"Bei X teilen\" role=\"button\" rel=\"noopener nofollow\" class=\"shariff-link\" style=\"; background-color:#000; color:#fff\" target=\"_blank\"><span class=\"shariff-icon\" style=\"\"><svg width=\"32px\" height=\"20px\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path fill=\"#000\" d=\"M14.258 10.152L23.176 0h-2.113l-7.747 8.813L7.133 0H0l9.352 13.328L0 23.973h2.113l8.176-9.309 6.531 9.309h7.133zm-2.895 3.293l-.949-1.328L2.875 1.56h3.246l6.086 8.523.945 1.328 7.91 11.078h-3.246zm0 0\"\/><\/svg><\/span><span class=\"shariff-text\">teilen<\/span>&nbsp;<\/a><\/li><li class=\"shariff-button linkedin shariff-nocustomcolor\" style=\"background-color:#1488bf\"><a href=\"https:\/\/www.linkedin.com\/sharing\/share-offsite\/?url=https%3A%2F%2Fblog.febi.com%2Fen%2Fxxl-project-start-of-construction-for-new-bilstein-group-logistics-center%2F\" title=\"Bei LinkedIn teilen\" aria-label=\"Bei LinkedIn teilen\" role=\"button\" rel=\"noopener nofollow\" class=\"shariff-link\" style=\"; background-color:#0077b5; color:#fff\" target=\"_blank\"><span class=\"shariff-icon\" style=\"\"><svg width=\"32px\" height=\"20px\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 27 32\"><path fill=\"#0077b5\" d=\"M6.2 11.2v17.7h-5.9v-17.7h5.9zM6.6 5.7q0 1.3-0.9 2.2t-2.4 0.9h0q-1.5 0-2.4-0.9t-0.9-2.2 0.9-2.2 2.4-0.9 2.4 0.9 0.9 2.2zM27.4 18.7v10.1h-5.9v-9.5q0-1.9-0.7-2.9t-2.3-1.1q-1.1 0-1.9 0.6t-1.2 1.5q-0.2 0.5-0.2 1.4v9.9h-5.9q0-7.1 0-11.6t0-5.3l0-0.9h5.9v2.6h0q0.4-0.6 0.7-1t1-0.9 1.6-0.8 2-0.3q3 0 4.9 2t1.9 6z\"\/><\/svg><\/span><span class=\"shariff-text\">teilen<\/span>&nbsp;<\/a><\/li><li class=\"shariff-button mailto shariff-nocustomcolor\" style=\"background-color:#a8a8a8\"><a href=\"mailto:?body=https%3A%2F%2Fblog.febi.com%2Fen%2Fxxl-project-start-of-construction-for-new-bilstein-group-logistics-center%2F&subject=XXL%20Project%3A%20Start%20of%20Construction%20for%20New%20bilstein%20group%20Logistics%20Center\" title=\"Per E-Mail versenden\" aria-label=\"Per E-Mail versenden\" role=\"button\" rel=\"noopener nofollow\" class=\"shariff-link\" style=\"; background-color:#999; color:#fff\"><span class=\"shariff-icon\" style=\"\"><svg width=\"32px\" height=\"20px\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 32 32\"><path fill=\"#999\" d=\"M32 12.7v14.2q0 1.2-0.8 2t-2 0.9h-26.3q-1.2 0-2-0.9t-0.8-2v-14.2q0.8 0.9 1.8 1.6 6.5 4.4 8.9 6.1 1 0.8 1.6 1.2t1.7 0.9 2 0.4h0.1q0.9 0 2-0.4t1.7-0.9 1.6-1.2q3-2.2 8.9-6.1 1-0.7 1.8-1.6zM32 7.4q0 1.4-0.9 2.7t-2.2 2.2q-6.7 4.7-8.4 5.8-0.2 0.1-0.7 0.5t-1 0.7-0.9 0.6-1.1 0.5-0.9 0.2h-0.1q-0.4 0-0.9-0.2t-1.1-0.5-0.9-0.6-1-0.7-0.7-0.5q-1.6-1.1-4.7-3.2t-3.6-2.6q-1.1-0.7-2.1-2t-1-2.5q0-1.4 0.7-2.3t2.1-0.9h26.3q1.2 0 2 0.8t0.9 2z\"\/><\/svg><\/span><span class=\"shariff-text\">E-Mail<\/span>&nbsp;<\/a><\/li><li class=\"shariff-button printer shariff-nocustomcolor\" style=\"background-color:#a8a8a8\"><a href=\"javascript:window.print()\" title=\"drucken\" aria-label=\"drucken\" role=\"button\" rel=\"noopener nofollow\" class=\"shariff-link\" style=\"; background-color:#999; color:#fff\"><span class=\"shariff-icon\" style=\"\"><svg width=\"32px\" height=\"20px\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 30 32\"><path fill=\"#999\" d=\"M6.8 27.4h16v-4.6h-16v4.6zM6.8 16h16v-6.8h-2.8q-0.7 0-1.2-0.5t-0.5-1.2v-2.8h-11.4v11.4zM27.4 17.2q0-0.5-0.3-0.8t-0.8-0.4-0.8 0.4-0.3 0.8 0.3 0.8 0.8 0.3 0.8-0.3 0.3-0.8zM29.7 17.2v7.4q0 0.2-0.2 0.4t-0.4 0.2h-4v2.8q0 0.7-0.5 1.2t-1.2 0.5h-17.2q-0.7 0-1.2-0.5t-0.5-1.2v-2.8h-4q-0.2 0-0.4-0.2t-0.2-0.4v-7.4q0-1.4 1-2.4t2.4-1h1.2v-9.7q0-0.7 0.5-1.2t1.2-0.5h12q0.7 0 1.6 0.4t1.3 0.8l2.7 2.7q0.5 0.5 0.9 1.4t0.4 1.6v4.6h1.1q1.4 0 2.4 1t1 2.4z\"\/><\/svg><\/span><span class=\"shariff-text\">drucken<\/span>&nbsp;<\/a><\/li><\/ul><\/div>","protected":false},"excerpt":{"rendered":"<p>The kick-off for an XXL construction project: Gelsenkirchen&#8217;s mayor, Frank Baranowski, and the managing directors of the bilstein group, Jan Siekermann and Karsten Sch\u00fc\u00dfler-Bilstein, announced yesterday, Wednesday, November 27th, 2019, the commencement of construction work on the new logistics centre for the Ennepetal-based company and jointly sank a time capsule. In 2017, the bilstein group, [&hellip;]<\/p>\n","protected":false},"author":27,"featured_media":5081,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[400],"tags":[485],"class_list":["post-5084","post","type-post","status-publish","format-standard","has-post-thumbnail","category-inside-en","tag-bilstein-group"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>XXL Project: Start of Construction for New bilstein group Logistics Center -<\/title>\n<meta name=\"description\" content=\"febi has big plans. In the heart of the Ruhr area in Germany, the bilstein group plans on building an expansive logistics centre.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/blog.febi.com\/en\/xxl-project-start-of-construction-for-new-bilstein-group-logistics-center\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"XXL Project: Start of Construction for New bilstein group Logistics Center -\" \/>\n<meta property=\"og:description\" content=\"febi has big plans. In the heart of the Ruhr area in Germany, the bilstein group plans on building an expansive logistics centre.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/blog.febi.com\/en\/xxl-project-start-of-construction-for-new-bilstein-group-logistics-center\/\" \/>\n<meta property=\"og:site_name\" content=\"febi Blog\" \/>\n<meta property=\"article:published_time\" content=\"2019-11-28T11:48:39+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2019-12-04T08:59:16+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/blog.febi.com\/wp-content\/uploads\/2019\/11\/Wifo\u2560\u00ea_Bilstein_Grundst__27-Kopie-1024x837.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"837\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Mary VerDuin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Mary VerDuin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/blog.febi.com\\\/en\\\/xxl-project-start-of-construction-for-new-bilstein-group-logistics-center\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/blog.febi.com\\\/en\\\/xxl-project-start-of-construction-for-new-bilstein-group-logistics-center\\\/\"},\"author\":{\"name\":\"Mary VerDuin\",\"@id\":\"https:\\\/\\\/blog.febi.com\\\/#\\\/schema\\\/person\\\/2931614cdd5ec2bd9854b643c53514b8\"},\"headline\":\"XXL Project: Start of Construction for New bilstein group Logistics Center\",\"datePublished\":\"2019-11-28T11:48:39+00:00\",\"dateModified\":\"2019-12-04T08:59:16+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/blog.febi.com\\\/en\\\/xxl-project-start-of-construction-for-new-bilstein-group-logistics-center\\\/\"},\"wordCount\":565,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/blog.febi.com\\\/en\\\/xxl-project-start-of-construction-for-new-bilstein-group-logistics-center\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/blog.febi.com\\\/wp-content\\\/uploads\\\/2019\\\/11\\\/Wifo\u2560\u00ea_Bilstein_Grundst__27-Kopie.jpg\",\"keywords\":[\"bilstein group\"],\"articleSection\":[\"Inside\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/blog.febi.com\\\/en\\\/xxl-project-start-of-construction-for-new-bilstein-group-logistics-center\\\/\",\"url\":\"https:\\\/\\\/blog.febi.com\\\/en\\\/xxl-project-start-of-construction-for-new-bilstein-group-logistics-center\\\/\",\"name\":\"XXL Project: Start of Construction for New bilstein group Logistics Center -\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/blog.febi.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/blog.febi.com\\\/en\\\/xxl-project-start-of-construction-for-new-bilstein-group-logistics-center\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/blog.febi.com\\\/en\\\/xxl-project-start-of-construction-for-new-bilstein-group-logistics-center\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/blog.febi.com\\\/wp-content\\\/uploads\\\/2019\\\/11\\\/Wifo\u2560\u00ea_Bilstein_Grundst__27-Kopie.jpg\",\"datePublished\":\"2019-11-28T11:48:39+00:00\",\"dateModified\":\"2019-12-04T08:59:16+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/blog.febi.com\\\/#\\\/schema\\\/person\\\/2931614cdd5ec2bd9854b643c53514b8\"},\"description\":\"febi has big plans. In the heart of the Ruhr area in Germany, the bilstein group plans on building an expansive logistics centre.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/blog.febi.com\\\/en\\\/xxl-project-start-of-construction-for-new-bilstein-group-logistics-center\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/blog.febi.com\\\/en\\\/xxl-project-start-of-construction-for-new-bilstein-group-logistics-center\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/blog.febi.com\\\/en\\\/xxl-project-start-of-construction-for-new-bilstein-group-logistics-center\\\/#primaryimage\",\"url\":\"https:\\\/\\\/blog.febi.com\\\/wp-content\\\/uploads\\\/2019\\\/11\\\/Wifo\u2560\u00ea_Bilstein_Grundst__27-Kopie.jpg\",\"contentUrl\":\"https:\\\/\\\/blog.febi.com\\\/wp-content\\\/uploads\\\/2019\\\/11\\\/Wifo\u2560\u00ea_Bilstein_Grundst__27-Kopie.jpg\",\"width\":4699,\"height\":3840,\"caption\":\"Jan Siekermann (left) and Karsten Sch\u00fc\u00dfler-Bilstein, Group Managing Directors of the bilstein group, sink a time capsule together with Gelsenkirchen's mayor, Frank Baranowski, for the start of construction of the new logistics centre (Photo: City of Gelsenkirchen, Hansj\u00fcrgen Smit).\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/blog.febi.com\\\/en\\\/xxl-project-start-of-construction-for-new-bilstein-group-logistics-center\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Startseite\",\"item\":\"https:\\\/\\\/blog.febi.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"XXL Project: Start of Construction for New bilstein group Logistics Center\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/blog.febi.com\\\/#website\",\"url\":\"https:\\\/\\\/blog.febi.com\\\/\",\"name\":\"febi Blog\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/blog.febi.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/blog.febi.com\\\/#\\\/schema\\\/person\\\/2931614cdd5ec2bd9854b643c53514b8\",\"name\":\"Mary VerDuin\",\"url\":\"https:\\\/\\\/blog.febi.com\\\/en\\\/author\\\/mary-verduinbilsteingroup-com\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"XXL Project: Start of Construction for New bilstein group Logistics Center -","description":"febi has big plans. In the heart of the Ruhr area in Germany, the bilstein group plans on building an expansive logistics centre.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/blog.febi.com\/en\/xxl-project-start-of-construction-for-new-bilstein-group-logistics-center\/","og_locale":"en_US","og_type":"article","og_title":"XXL Project: Start of Construction for New bilstein group Logistics Center -","og_description":"febi has big plans. In the heart of the Ruhr area in Germany, the bilstein group plans on building an expansive logistics centre.","og_url":"https:\/\/blog.febi.com\/en\/xxl-project-start-of-construction-for-new-bilstein-group-logistics-center\/","og_site_name":"febi Blog","article_published_time":"2019-11-28T11:48:39+00:00","article_modified_time":"2019-12-04T08:59:16+00:00","og_image":[{"width":1024,"height":837,"url":"https:\/\/blog.febi.com\/wp-content\/uploads\/2019\/11\/Wifo\u2560\u00ea_Bilstein_Grundst__27-Kopie-1024x837.jpg","type":"image\/jpeg"}],"author":"Mary VerDuin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Mary VerDuin","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/blog.febi.com\/en\/xxl-project-start-of-construction-for-new-bilstein-group-logistics-center\/#article","isPartOf":{"@id":"https:\/\/blog.febi.com\/en\/xxl-project-start-of-construction-for-new-bilstein-group-logistics-center\/"},"author":{"name":"Mary VerDuin","@id":"https:\/\/blog.febi.com\/#\/schema\/person\/2931614cdd5ec2bd9854b643c53514b8"},"headline":"XXL Project: Start of Construction for New bilstein group Logistics Center","datePublished":"2019-11-28T11:48:39+00:00","dateModified":"2019-12-04T08:59:16+00:00","mainEntityOfPage":{"@id":"https:\/\/blog.febi.com\/en\/xxl-project-start-of-construction-for-new-bilstein-group-logistics-center\/"},"wordCount":565,"commentCount":0,"image":{"@id":"https:\/\/blog.febi.com\/en\/xxl-project-start-of-construction-for-new-bilstein-group-logistics-center\/#primaryimage"},"thumbnailUrl":"https:\/\/blog.febi.com\/wp-content\/uploads\/2019\/11\/Wifo\u2560\u00ea_Bilstein_Grundst__27-Kopie.jpg","keywords":["bilstein group"],"articleSection":["Inside"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/blog.febi.com\/en\/xxl-project-start-of-construction-for-new-bilstein-group-logistics-center\/","url":"https:\/\/blog.febi.com\/en\/xxl-project-start-of-construction-for-new-bilstein-group-logistics-center\/","name":"XXL Project: Start of Construction for New bilstein group Logistics Center -","isPartOf":{"@id":"https:\/\/blog.febi.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/blog.febi.com\/en\/xxl-project-start-of-construction-for-new-bilstein-group-logistics-center\/#primaryimage"},"image":{"@id":"https:\/\/blog.febi.com\/en\/xxl-project-start-of-construction-for-new-bilstein-group-logistics-center\/#primaryimage"},"thumbnailUrl":"https:\/\/blog.febi.com\/wp-content\/uploads\/2019\/11\/Wifo\u2560\u00ea_Bilstein_Grundst__27-Kopie.jpg","datePublished":"2019-11-28T11:48:39+00:00","dateModified":"2019-12-04T08:59:16+00:00","author":{"@id":"https:\/\/blog.febi.com\/#\/schema\/person\/2931614cdd5ec2bd9854b643c53514b8"},"description":"febi has big plans. In the heart of the Ruhr area in Germany, the bilstein group plans on building an expansive logistics centre.","breadcrumb":{"@id":"https:\/\/blog.febi.com\/en\/xxl-project-start-of-construction-for-new-bilstein-group-logistics-center\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/blog.febi.com\/en\/xxl-project-start-of-construction-for-new-bilstein-group-logistics-center\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/blog.febi.com\/en\/xxl-project-start-of-construction-for-new-bilstein-group-logistics-center\/#primaryimage","url":"https:\/\/blog.febi.com\/wp-content\/uploads\/2019\/11\/Wifo\u2560\u00ea_Bilstein_Grundst__27-Kopie.jpg","contentUrl":"https:\/\/blog.febi.com\/wp-content\/uploads\/2019\/11\/Wifo\u2560\u00ea_Bilstein_Grundst__27-Kopie.jpg","width":4699,"height":3840,"caption":"Jan Siekermann (left) and Karsten Sch\u00fc\u00dfler-Bilstein, Group Managing Directors of the bilstein group, sink a time capsule together with Gelsenkirchen's mayor, Frank Baranowski, for the start of construction of the new logistics centre (Photo: City of Gelsenkirchen, Hansj\u00fcrgen Smit)."},{"@type":"BreadcrumbList","@id":"https:\/\/blog.febi.com\/en\/xxl-project-start-of-construction-for-new-bilstein-group-logistics-center\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Startseite","item":"https:\/\/blog.febi.com\/en\/"},{"@type":"ListItem","position":2,"name":"XXL Project: Start of Construction for New bilstein group Logistics Center"}]},{"@type":"WebSite","@id":"https:\/\/blog.febi.com\/#website","url":"https:\/\/blog.febi.com\/","name":"febi Blog","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/blog.febi.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/blog.febi.com\/#\/schema\/person\/2931614cdd5ec2bd9854b643c53514b8","name":"Mary VerDuin","url":"https:\/\/blog.febi.com\/en\/author\/mary-verduinbilsteingroup-com\/"}]}},"_links":{"self":[{"href":"https:\/\/blog.febi.com\/en\/wp-json\/wp\/v2\/posts\/5084","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blog.febi.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blog.febi.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blog.febi.com\/en\/wp-json\/wp\/v2\/users\/27"}],"replies":[{"embeddable":true,"href":"https:\/\/blog.febi.com\/en\/wp-json\/wp\/v2\/comments?post=5084"}],"version-history":[{"count":1,"href":"https:\/\/blog.febi.com\/en\/wp-json\/wp\/v2\/posts\/5084\/revisions"}],"predecessor-version":[{"id":5087,"href":"https:\/\/blog.febi.com\/en\/wp-json\/wp\/v2\/posts\/5084\/revisions\/5087"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/blog.febi.com\/en\/wp-json\/wp\/v2\/media\/5081"}],"wp:attachment":[{"href":"https:\/\/blog.febi.com\/en\/wp-json\/wp\/v2\/media?parent=5084"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blog.febi.com\/en\/wp-json\/wp\/v2\/categories?post=5084"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blog.febi.com\/en\/wp-json\/wp\/v2\/tags?post=5084"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}